Multilateral technology and performance criteria

Flow rate from 40% to 100%

An additional sidetrack produces 40% to 100% incremental flow rate, while well construction costs are only 15% to 20% higher

Savings from USD 400K

Only during construction of a multilateral well

1. Drilling casing string sections

Drilling casing hole sections, such as conductor, surface casing, intermediate and production casing, takes 70% to 90% of costs and rig time.

Construction time
70
Construction costs
75
Oil production volume
0

2. Drilling liner sections

Drilling liner sections takes 8% to 15% of costs and rig time. Due to high costs at the initial stage, oil production is not very cost effective.

Construction time
15
Construction costs
10
Oil production volume
50

3. A sidetrack gives the following benefits

With 15% to 20% higher completion costs, our customers can improve flow rates by more than 2 times from one well. One well can have from 2 to 5 additional side tracks.

Construction time
15
Construction costs
15
Oil production volume
50