Well was completed with TAML 1 system in complex geological structure with a thin lens-shaped reservoir.
Case study:
Construction of a well with TAML 1 system in the thin lens-shaped reservoir.
Case study:
Construction of the well at TAML 2 level was performed by an external company. The job was complicated by having no depth reference, well azimuth and exact window cutting data.
Case study:
Horizontal multilateral wells completion with TAML 1 system.
Case study:
Multilateral well completion with TAML 3 junction installation in the open hole. There is the world first successful done job with an ability to have selective access to both laterals without any additional intervention equipment installation.
Case study:
The TAML 1 completion system includes sidetracking from open hole section using a bore thru whipstock and setting a mainbore and lateral liners.
Case study:
Wells were completed without SQ and HSE incidents achieving all KPI targets.
Several large projects were given by clients for multilateral completion with ML One technology within the Eastern Siberia.
Sidetracking from the cased well; offshore project in the Caspian region.
Case study:
115114, Moscow, Derbenevskaya naberezhnaya 11, floor 3, office B-303
450591, Ufa district, Zubovo, Dorozhnaya 2/1
452680, Neftekamsk,
Stroiteley 59
115114, Moscow, Derbenevskaya naberezhnaya 11, floor 3, office B-303
450591, Ufa district, Zubovo, Dorozhnaya 2/1
452680, Neftekamsk,
Stroiteley 59